Find sites with interconnection headroom.

Land, grid and buildable acres on one map, nationwide. Built for owner-operators, growth developers and data center developers.

Book a demo
Step one: a parcel picked in Bell County, Texas, on the aerial ground, with its area on the plate

Try it on a real site.

A parcel in Bell County, Texas, beside a high-voltage substation, read live from Northlight. Pick a stop, then drag the map or hover a line.

The grid

Texas and its neighbours

Transmission lines and substations in every state. Here, the high-voltage backbone.

Hover a line for its name and operator. Nothing on the map is a rating, a capacity or live topology.

Everything a site screen needs, on one map.

Clarity on capacity

Injection capacity by year and load case at the substation you pick, with its confidence tier and the case that binds.

Injection capacityExample site
Summer peak120 to 170 MW, binds
Minimum load150 to 210 MW
Winter peak190 to 250 MW

Summer peak binds in 2028: the lowest band of the three load cases sets the injection the site can count on.

Example site with illustrative figures, not a study result. Real bands come from ViewZ studies on the ISO base case, with the binding element named.

The grid, permits and local risk

Every layer a site screen needs, nationwide, each with its citation.

  • Transmission lines
  • Substations
  • Power plants
  • Gas pipelines
  • Floodplain
  • Wetlands
  • Incentive areas
  • Permits
  • Local ordinances and moratoriums
  • Tax abatements
  • Groundwater districts
The right-click card on Temple Pecan Creek Substation: voltages, operator claims, the lines it ties to, the source and the disclaimer

Every acre accounted for

Watch each layer take land out of a parcel, and see what is left to build on.

See your own sites on Northlight.

Tell us where you are looking. We set up a demo on your sites and walk you through the screen.

Your mail app opens with this filled in. Or write to hello@northlightos.com.